While masonry progresses under tarps on the outside much work is taking place inside the main church. All the concrete for main floor and altar have been poured. Most of the steel trusses have been wrapped with wood laminate. Columns along the walls are being framed at the base and wrapped in wood above. Drywall is progressing quickly on the ceiling and some of the walls. Not much has changed in the chapel but the wheelchair ramp is poured. In the Narthex the drywall is mostly complete with work concentrated on the entryway. The doors between the main church and Narthex are framed. In the connector building steel doors have been installed and all the drywall is nearly finished. Many other small details are progressing everywhere.