Most of the work has been taking place inside and around the building. Tarps have been wrapped around the scaffolding on the north and east of the
bathrooms/multipurpose/parlor. Inside it is heated and masons are starting to lay stone on the exterior of the building. Inside the gathering space temperatures are steadily rising to get the frost out of the ground and heat the building. Electricians have been busy putting in conduit above and below (in the ground) that feed different parts of the building and the main church yet to be erected. The exterior columns to the gathering space have been wrapped in blue insulation in preparation for masonry work. Some steel that will be used for the main church has arrived this week, more expected soon. Dirt work continues slowly due to the frost, but crews continue progress.